• Home
  • News
  • Diary
  • Contact Us
  • About Us
  • Subscriptions
Molewood Residents Association

Residents’ views put to planning inspector

17th May 2018 9:36 pm / molewood

A number of views of the quarry proposal have been collated by Ben Penrose, MRA Chairman, and provided to the planning inspector.  These are the views of the residents who will be affected by any quarry and are replicated here.

Our association covers an area of housing predominantly West of Bengeo Street and Sacombe Road and to the brow of the hilltop in Bengeo.  It covers circa 700 households, many of which are on the perimeter of the proposed quarry and many more that could be directly impacted by noise, dust and traffic.  We work closely with other residents groups including Lower Bengeo (LOBRA); Bengeo Mews, WERA and Great Molewood and whilst I am here only to represent the views of the residents in our part of Bengeo I can advise that the issues I present today, in particular points 2 & 3 are on the agenda of all Residents Associations in Bengeo.

The points I present today are not a repeat of the core issues that will be presented in depth by other speakers but more the “grey-ish” elements – between the black and white of the applicants proposals.  The considerations upon which daily lives and the happiness of our residents are built upon, and those points which probably fall out of the consideration more specifically to the site.

The 3 points I raise today are thoughts presented to the Committee and I as we meet our members, talk-shop with neighbours and go about our daily lives in our beloved part of Hertfordshire.  They’re:

  1. The Impacts to Health & Wellbeing of our residents
  2. The concerns of our residents to the traffic impacts of the quarry
  3. The absence of any pro-active consultation during the planning process

Health & Wellbeing

There are significant health risks to our more vulnerable residents in the presence of dust in the air and for our general wellness in respect to noise, dirt and the loss of valuable green space.  I am not going to dwell on these elements as this is a path well-worn; preferring to raise my concerns about the impact that this process has already had on the health and wellbeing of Molewood Residents.

We have parents worrying about whether Bengeo Primary is the right school to put their children at risk in – unbeknown to them what decision will be made yet the time is ticking on a decision.

We have older residents who remember the noise disturbance from Waterford Quarry when it was operational and whom today have their concerns for further noise and disruption in their retirement?

We have residents whose lives have been put on hold by the Quarry, perhaps unable or unwilling to sell their house now the quarry looms nearby. The worry twofold as property values plummet and the thought of vehicles quarrying just metres from their houses

Perhaps most importantly for some of our residents the damage has already been done, the cost to their own personal lives, health and happiness as this application and subsequent appeal has been a heavy one; who foots the bill for the tireless volunteer?  Those who invested lost hours of sleep and mental energy into fighting this appeal on behalf of our community.  These residents trying to unpick the late changes, about turns and idiosyncrasies of the planning process, for some of the people representing their views during the process the damage done is already visible; their lives and happiness shattered, their anger fuelled and their frustration evident.  The physical toll of late nights and juggling work, family and this task.  Is life not hard enough already?  And when we venture onto that Green Field we leave worrying could this be the last time we get to enjoy it.

We have a traffic problem in Molewood

We have route through our residence which releases some of the pressure on the main arterial roads of Hertford.  The majority of people using this route are travelling from Bishop’s Stortford/Buntingford/Ware to Welwyn, Hatfield & Watford, all areas destined to receive more housing in the East Herts District Plan so this situation is unlikely to get better anytime soon.  These people reach Hertford in a desperate and frustrated state, the time ticking on reaching their employment, school, etc.  This worry for their lateness translates into speeding. Speeds in excess of 30mph are possible within the entrance to the road and the gates of the school.

How long before a child is seriously injured?

Beyond that The Avenue opens up and cars can reach speeds of 50mph onto a blind bend in residential streets. How long before the first fatality?

Perhaps one of our more senior residents crossing to get a paper from the newsagents?  Round the corner and the race to the end of The Avenue. 40/50/60 mph all witnessed in a 20mph zone.

This is today, what tomorrow when 6 aggregate lorries have all arrived at the site and are queueing to get in at once? Perhaps a driver decides with the traffic on the A10 queueing at Ware and Hertford they’ll turn right anyway, blocking Bengeo Street and encouraging another 100 cars to ride rough-shod over our community.  These are not considerations bought into the traffic impact assessment and their impact is far reaching – affecting Lower Bengeo and Waterford too!

Absence of pro-active colsultation

We have been in existence as a Residents Association for 53 years.  We are well represented at our Annual General Meetings, have our own web-site and are recognised by local councillors as a proactive way to engage our community.

During the applications the applicants have not engaged us, sought our opinions, provided us information or addressed our concerns in person.  Despite the strength of feeling amongst the community the applicants have continued to demonstrate a lack of local community engagement, moreover they demonstrate an intent to present information at the last minute and to undermine the points that our community has to make.  This feels far from the spirit of engagement & openness

As I see it today this application is:

  • Already damaging the health and wellbeing of Molewood residents before an inch of soil has been removed from the field
  • Threatening to cause further impacts on our quality of life as the pressure on our road network continues to grow and this is without the lorry movements each day
  • Has failed to engage an active and visible Residents Association who could have been engaged before the process begun.  The applicant hasn’t and has demonstrated no intent to either.
Posted in: News

Comments are closed.

Post Navigation

← Previous Post
Next Post →

Upcoming Events

Notice
There are no upcoming events.

Recent Posts

  • Bengeo Community Event
  • Sacombe Rd to be partially closed
  • Bengeo Mosaic revealed
  • Bengeo Community Garden Bingo
  • Spring 2026

Links

  • Local Links
  • Neighbourhood Watch
  • Newsletters
  • Travel Info
  • Olde Molewood
  • In The Area
  • Go Hertford
  • Subscriptions
© Copyright 2026 - Molewood Residents Association
Infinity Theme by DesignCoral / WordPress