Hertfordshire County Council have written to the MRA with a summary of the responses from the 20mph consultation. This letter can be seen below:
Enforcement of the 20mph zone
We received a number of concerns questioning how the 20 mph zone will be enforced.
The 20 mph zone has been assessed against the Hertfordshire County Council (HCC) Speed Management Strategy (SMS). As outlined in the HCC SMS, the Police are responsible for enforcing speed limits across the County on all roads. The County Council as Highway Authority is responsible for providing speed management measures on the public highway to reinforce appropriate speeds (except those maintained by Highways England).
Extension of the 20mph zone
A number of responses questioned why the 20 mph zone does not include Port Hill, Bengeo Street, Sacombe Road, Beane Road and Wadesmill Road.
The implementation of this 20 mph zone has followed the HCC SMS. Port Hill and Bengeo Street are classified as B type roads. In accordance with the HCC SMS, 20 mph zones will not be generally considered on B road networks. It was decided to exclude Sacombe Road as it connects to Bengeo Street and a key aim of zones is to have a coherent, self-contained zone. This is provided by our proposals as the zone is bounded by Sacombe Road, Bengeo Street and Port Hill. Were Sacombe Road incorporated into the zone, a driver heading south on Sacombe Road would potentially move from a 60 mph limit (Sacombe Road) to a short section of a 20 mph zone (Sacombe Road) and back to 30 mph (Bengeo Street) in quick succession. This would raise the issue of compliance and a key part of a zone is self-enforcement.
Beane Road was also excluded from the zone as it is a highly trafficked road connecting to North Road and it provides access to other towns such as Welwyn Garden City and Stevenage. The environment along Beane Road is also not conducive to a 20 mph limit.
Implementation of the 20mph zone
The perception from the responses is that cars cannot exceed 20 mph as a result of the narrow streets and the abundance of parked cars on the footway, carriageway and junctions. Furthermore, a number of residents have also expressed concerns that West Bengeo is still being used as a rat run (bypassing the town centre and its congestion to get to the train station and west Hertfordshire) despite restrictions being put in place.
It is feasible to do nothing however the formalised zone will seek to alter a greater proportion of driver behaviour and encourage a lower speed environment. The proposed area has been selected due to its similar environments and features so as to maintain a continuous, self-contained area (predominately residential with isolated commercial businesses).
We have provided all of the feedback received to the Project Sponsor and County Councillor Andrew Stevenson. We confirm that the public consultation period has ended and we will not be providing further responses to any correspondence. This letter is for information only.
The formal consultation period for the Traffic Regulation Order (TRO) advertising the zone will begin shortly. This provides the opportunity for people to formally comment on the proposals. Subject to the outcome of the subsequent TRO, our current programme anticipates implementing the scheme later this financial year, subject to contractor programming. The contractor will issue further information on the specific works closer to the implementation date.
Should you have any further concerns regarding highway issues or wish to report a highway fault these should be directed to our online reporting system www.hertsdirect.org/highwayfaults or telephone 0300 123 4047.