Planned application

Planned application

On 20th April Lafarge met the Waterford Group to keep them updated on progress with the Sacombe Rd development. This development is for 8 homes adjoining Sacombe Rd, and the original details can be found here.

Here are the minutes for the meeting:

Lafarge Tarmac attendees
Lloyd McInally Project Manager
Ruth Roll Stakeholder Engagement
Spencer Warren Project Planner

The meeting had been called to update local stakeholders of the current status of the project and the anticipated timescales for development.
The meeting was co-ordinated for the group by George Sandell and Tony Vickers.

1 Ruth Roll. For the benefit of some new attendees RR provided a background to the project – up to and including the planning committee meeting in May 2014, which agreed planning permission should be granted.

2 Spencer Warren ran through the draft planning conditions – of which the most important was that the development should be carried out in accordance with the planning submission documents.
The timetable for grant of permission will be based around the issue of the legal agreement – which is anticipated to be approximately 4 weeks away. It will include conditions covering:

  • the footpath
  • highways
  • drainage
  • contaminated land
  • landscape boundaries
  • certification re sustainability etc.

There is nothing unusual in the conditions.
Some tweeks also need to be agreed for the permission, such as enhancing sustainability by using recycled construction materials for the footpath.

3 Lloyd McInally introduced himself as a Chartered Surveyor and the current project manager. As a generalist, he is bringing together and leading a team of specialists to deliver the project as soon as possible. A project team will be appointed including a contractor, structural engineers and architects to turn the planning permission in to reality.
Conventional house builders take their plans off the shelf and do what they have always done to build conventional houses. At Waterford, he needs to look at:

  • a different way of using conventional building materials
  • seeking to drive a change in building practices
  • making buildings more sustainable by using concrete
  • making sure the properties deliver on their guarantees/warranties (not for planning purposes but necessary for new market housing types)
  • the need for an iterative process, looking at design in detail, to minimise reliance on fossil fuels
  • reviewing the initial cost of this process. If it is too high for market prices, then value engineers will be called in to make the design marketable now – for both LT and the potential buyers
  • to determine the right combination of:
    • product
    • design
    • price
    • technical expertise

    and then bring in the contractor to deliver the specified details.

To meet this requirement, the builder will not be a current, conventional house builder, but a new entrant in to the market who recognises the need to drive the thermal mass element forward. The technology will be of fit and forget design and the builders will adhere to the Considerate Contractors Scheme for the industry.

4 Timescale

  • 3 – 6 months to appoint a contractor (meeting 3 x different multi-disciplinary teams) – and a delivery timetable will then be set
  • anticipated 12 – 18 months build time.

This is a feasible timescale to move from a great idea → getting planning → delivery on the ground.

5 Q&A session
Q1 Barrie Goldsmith (FPP, Hertford Civic Society, Sustrans)
Environmental impact of a big pile of ground up concrete to be used for footpaths – adverse impact on neighbours?
A1 Best practice and Considerate Contractors Scheme will be followed in all cases to minimise any impacts.

Q2 Cllr Peter Ruffles (wearing his Town Councillor hat)
Particular interest from Bengeo residents re status of footpath (permissive or not)?
A2 The footpath would be a standard width, fully engineered with a preference for a gravel surface – and would have to be in place before the houses were occupied. LT would be happy to have the path adopted.

Q3 Tim Croft (Sacombe Road)
A particular interest in seeing detailed notes on all trees, the work that is to be done to them, details of the textile membrane, flora (full ecological survey works), details of Phase 1 site visit?
A3 LT to provide Tim with all tree/ecological information submitted with the application.

Q4 George Sandell (Stapleford PC)
Will 6 – 8’ fence be retained until last possible point?
A4 Yes – to maximise benefit as a screen for reducing both visual impact and avoiding trespass.

Q5 Councillor Andrew Stevenson (Hertfordshire County Council)
Will the properties be marketable across all sectors? What will happen to the house where the performance monitoring will be carried out?
A5 Yes, the design and build brief is to make the properties as attractive as possible to house builders for a range of places, with genuine replicable costings. There are one or two options being investigated for the monitoring house – LT could either retain the freehold ownership or enter in to part ownership to allow access for monitoring. LT is certain people would be interested in living in a house like this.

Q6 Marcella Randall (Stapleford PC and voluntary HMWT ward for Waterford Heath)
In earlier discussions, had it not been agreed that a service charge might cover the monitoring – as well as providing for ecological monitoring and enhancement of the southern triangle?
A6 Yes – a management charge and a management committee are both still envisaged.

6 Follow up action

  • see attached list/notes of new people to be added to the database. Hard copy documents of the following to be provided:
    • ecological/tree reports to Tim Croft
    • executive summary and tree report to Paul Jarczewski
    • reports from UoH 21/04 conference to be provided to Cllr Andrew Stevenson.
  • site plan and executive summary to Gill and Peter Barker (please note two postal addresses).
  • executive summary and tree survey to Paul McKay/Jane Simpson (ie 2 x copies to same address).
Posted in: News

Comments are closed.

Post Navigation

← Previous Post
Next Post →

Upcoming Events

Notice
There are no upcoming events.

Recent Posts

  • Bengeo Community Event
  • Sacombe Rd to be partially closed
  • Bengeo Mosaic revealed
  • Bengeo Community Garden Bingo
  • Spring 2026

Links

  • Local Links
  • Neighbourhood Watch
  • Newsletters
  • Travel Info
  • Olde Molewood
  • In The Area
  • Go Hertford
  • Subscriptions
© Copyright 2026 - Molewood Residents Association
Infinity Theme by DesignCoral / WordPress