• Home
  • News
  • Diary
  • Contact Us
  • About Us
  • Subscriptions
Molewood Residents Association

Sacombe Road

21st October 2011 8:44 pm / molewood
Plan of new development

Plan of new development

The roads are now being laid and the flats and houses are well under construction, and we should soon be able to see the buildings appear above the perimeter fence.

Having spoken to a couple of the builders we understand that some properties may be ready for habitation as soon as January 2012.

The personnel on the site are polite, and doing everything they can to cause as little inconvenience as possible to local residents. However, we have been advised that there have been some unfortunate incidents, like the padlock being super glued, and health and safety notices removed.

The construction personnel have arranged to park all their vehicles in the Garden Centre, so as not to impede the flow of traffic or inconvenience locals.

Whereas the majority people would have preferred not to have this construction, criminal damage is not the answer, and the removal of safety notices could lead to an accident.

The site will be built and the builders are only doing their job and trying to be as professional as possible.

If you are interested in finding out more about the development please click on one of the links below:
Planning Details
Fairview Homes

Posted in: News

Comments are closed.

Post Navigation

← Previous Post
Next Post →

Upcoming Events

Notice
There are no upcoming events.

Recent Posts

  • Bengeo Community Event
  • Sacombe Rd to be partially closed
  • Bengeo Mosaic revealed
  • Bengeo Community Garden Bingo
  • Spring 2026

Links

  • Local Links
  • Neighbourhood Watch
  • Newsletters
  • Travel Info
  • Olde Molewood
  • In The Area
  • Go Hertford
  • Subscriptions
© Copyright 2026 - Molewood Residents Association
Infinity Theme by DesignCoral / WordPress