{"id":3194,"date":"2017-10-18T20:18:06","date_gmt":"2017-10-18T19:18:06","guid":{"rendered":"http:\/\/www.molewood.org.uk\/?p=3194"},"modified":"2017-10-30T19:21:31","modified_gmt":"2017-10-30T19:21:31","slug":"urgent-call-to-stop-double-threat-to-bengeo","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=3194","title":{"rendered":"Urgent call to stop double threat to Bengeo"},"content":{"rendered":"<div id=\"attachment_3196\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/10\/sbq_map.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3196\" class=\"size-full wp-image-3196\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/10\/sbq_map.jpg\" alt=\"Quarry proposal map\" width=\"300\" height=\"449\" srcset=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/10\/sbq_map.jpg 300w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/10\/sbq_map-200x300.jpg 200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-3196\" class=\"wp-caption-text\">Quarry proposal map<\/p><\/div>\n<p>Bengeo residents are now faced with a double threat to their natural landscape and the possible contamination of Hertford&#8217;s water supply, as developers continue to pursue their proposal of a quarry at Bengeo Field (along the B158 and Sacombe Road). Despite the depth of opposition against the Bengeo quarry proposal, the applicants have submitted both an appeal against the original decision to decline planning permission, <em>and<\/em> a new planning application, making it harder and more confusing for the public to fight the proposed plans. The Stop Bengeo Quarry Campaign (SBQ) is calling for an urgent public response to the matter, with the situation requiring separate letters of objection to be sent by <strong>early November<\/strong>.<\/p>\n<p><strong>MP Mark Prisk<\/strong> commented: &#8220;<em>It&#8217;s very disappointing to see another attempt to force a quarry onto the community at Bengeo. The case against remains clear &#8211; it would be bad for air quality, bad for traffic and bad for water quality. All of us made this clear last time, and like other members of the community I remain opposed to this application, just as I did the last.&#8221;<\/em><\/p>\n<p>Frustratingly for local residents, who have already done so much for the campaign, it is vital that responses are sent to two different bodies (<strong>Hertfordshire County Council<\/strong> and <strong>The Planning Inspectorate<\/strong>) to ensure the applicants&#8217; requests for planning are denied. The deadlines for objections to the appeal and application are <strong>2<sup>nd<\/sup> and 7<sup>th<\/sup> November<\/strong>, giving people little time to voice their concerns. <strong>Aska Pickering<\/strong>, the Chairperson of the SBQ campaign, said<em>: &#8220;We are doing all we can to raise awareness about this situation and we urge the local community to voice their objections, before it is too late.&#8221;<\/em><\/p>\n<p>In the new proposal, the period and volume of the gravel extraction have been reduced. The area of the quarry will be also slightly reduced to fit within the current &#8220;preferred area&#8221;\u009d requirement. However, the character of the Bengeo Field landscape will be lost permanently, if the proposal is approved. With the entrance to the quarry from the B158, it would be in operation from 7am to 6pm Monday to Friday and 7am to 1pm on Saturdays. The site would receive, on average, a minimum of 80 lorries per day which equates to 440 lorries per week with 1 to\/from the site every 8 minutes.<\/p>\n<p>The new proposal is not hugely different from the previous application and most of the serious concerns regarding the impact of Bengeo quarry still remain. Bengeo residents and school children would be faced with the prospect of a large quarry on their doorstep. The repercussions of a Bengeo quarry are truly worrying not just for Bengeo residents but all those living in Hertford due to the risk that it poses through the possible contamination of the whole of Hertford&#8217;s water supply. Other equally worrying concerns include traffic and pollution (dust, noise, fumes), health concerns and irreparable damage to the landscape.<\/p>\n<p>Please see below for the details for the two objection letters. Further information can be found on the Stop Bengeo Quarry Facebook page and website: <a href=\"http:\/\/stopbengeoquarry.org.uk\/\">http:\/\/stopbengeoquarry.org.uk<\/a>, and sample letters can be found at the bottom of the page.<\/p>\n<p><strong>THE NEW APPLICATION <\/strong><br \/>\nRef: PL\\0870\\17<br \/>\nComments and objections to Herts County Council by <strong>2<sup>nd<\/sup> November<\/strong> to:<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:spatialplanning@hertfordshire.gov.uk\">spatialplanning@hertfordshire.gov.uk<\/a><br \/>\n<strong>Post:<\/strong> Ms Felicity Hart, HCC Planning Officer, Spatial Planning &amp; Economy Unit C, Hertford SG13 8DN<\/p>\n<p><strong>THE APPEAL<\/strong><br \/>\nRef: AP\/M1900\/W\/17\/3178839<br \/>\nComments and objections to The Planning Inspectorate by <strong>7<sup>th<\/sup> November <\/strong>to:<br \/>\n<strong>On-line<\/strong>: <a href=\"https:\/\/acp.planninginspectorate.gov.uk\">https:\/\/acp.planninginspectorate.gov.uk<\/a><br \/>\n<strong>Post (3 copies are required!):<\/strong> Ms Holly Dutton, The Planning Inspectorate, Room 30, Temple Quay House, 2 The Square, Bristol BS1 6PN<\/p>\n<p>The developer is counting on residents being &#8220;battle weary&#8221; and any signs of weakness on our part will be used against us. This is why now, more than ever, it is important that we stick together and fight these dreadful proposals.<\/p>\n<p>This article has come from <a href=\"http:\/\/stopbengeoquarry.org.uk\/\" target=\"_blank\">Stop Bengeo Quarry<\/a>, where you can find out more information and ways to help.<\/p>\n<hr \/>\n<p><strong>Sample letter for New Application<\/strong><\/p>\n<p>Dear Ms Hart,<\/p>\n<p>I am writing to you in regards to the new application for the phased extraction of 1.25 mln tonnes of sand and gravel on land at Ware Park, Wadesmill Road, Hertford (locally known as Bengeo Field) &#8211; your reference PL\\0870\\17.<\/p>\n<p>Having reviewed the application documents available on HCC website I strongly object to the proposed quarry application on the following grounds: [List your reasons, these can include arguments used previously, you can find them on 2nd page of this leaflet <a href=\"http:\/\/www.stopbengeoquarry.org.uk\/SBQ-Feb-Leaflet.pdf\">http:\/\/www.stopbengeoquarry.org.uk\/SBQ-Feb-Leaflet.pdf<\/a>. We are also adding below further points you may want to include]<\/p>\n<p>1) Loss of beautiful landscape just outside Hertford visible from areas around<\/p>\n<p>2) Loss of amenity for local residents &#8211; walkers, joggers, cyclists, dog walkers etc. The byway \/ footpath has just been registered as the Asset of Community Value by EHDC &#8211; recognising its value and importance for residents (as well as visitors). The amended application disrupts use of the footpath because lorries will have to cross it to get to the exit onto the B158, and potentially the loss of amenity is worse because the plant operation will be adjacent to the footpath rather than down the slope next to the road (as suggested in previous application).<\/p>\n<p>3) Dust and noise pollution and health concerns &#8211; close proximity to Bengeo Primary School and residential homes and play area<\/p>\n<p>4) Threat to Hertford&#8217;s water supply due to proximity to boreholes and potential damage to chalk aquifer<\/p>\n<p>5) Road safety and traffic concerns (entrance from B158 as before, concerns about queuing lorries)<\/p>\n<p>6) Negative impact on environment, loss of natural habitat for wildlife, impact on trees (St John&#8217;s Wood, Lonely Oak Tree)<\/p>\n<p>7) No need for further gravel extraction in Herts (current landsbank is double legal requirements)<\/p>\n<p>NEW POINTS OF OBJECTION:<\/p>\n<p>8)\u00a0 The new application area is within the current Minerals Local Plan &#8220;preferred area&#8221; (you may recall the previous application included areas outside the preferred area &#8211; phase 4 is now not to be used). The new emerging MLP is in the process of approval and it has been recommended by HCC that Bengeo Field is no longer considered as preferred area. The formal approval of new MLP is expected in 2018. Surely this has to be taken into consideration at this planning process. Additionally in the current (old) MLP this area was agreed as preferred area ONLY as an extension to Rickney&#8217;s quarry and not as a separate quarry they are proposing (entrance was to be through the Rickney&#8217;s access)<\/p>\n<p>9.) The new proposal suggest extracting 1.25 million tonnes (previously 1.75 million tonnes) and it is proposed to last 5-8 years (previously 8-10 years). Are there any guarantees that once started the extraction will not continue \/ be extended beyond the above (as we believe has been the case with other quarries)? Additionally there does not appear to be a contour ma explaining how extraction of 1.25 mln tonnes will impact on the landscape afterwards. No soil will be allowed to be brought in here, so will the landscape be left as a big hole with a dangerous pond (&#8220;annuation area&#8221;) along the footpath?<\/p>\n<p>10) The proposed hours of operation are 7.00 -18.00 Monday to Friday and 7.00 to 13.00 on Saturdays. Proposed lorry movements are estimated at minimum 80 per day on average (40 in, 40 out). All HGVs are to turn left when exiting the site to go along Wadesmill Road to the A602 and A10. What guarantees are there that there would be no more than 80 lorries? There will be a huge impact on roads, traffic and the road entrance (which appears to remain the same &#8211; from B158). Queuing lorries and road safety concerns remain the same. The noise and diesel fumes pollution concerns remain.<\/p>\n<p>11.) Despite the application documents submitted by the applicant mention (very confusingly!) the stockpile area in its title, the application suggests there will be no stockpile area (as in the previous application). Instead there will be the mobile dry-screening at the point of extraction. This will be simply done before loading lorries and this raises further noise concerns. Was there a new noise assessment provided taking this into account?<\/p>\n<p>Finally I would like to comment on the state of this new application submission. I understand this is a new application for a Bengeo quarry but the documents submitted to HCC are confusingly presented as revisions and updated versions of the previous applications. This is very confusing for the residents less used to the planning processes and may impact on the level of response. Additionally, the timing of this new application is also in parallel to the appeal process against the rejection of the previous application. Again this will cause further confusion about two processes and may impact the number of presentations received. However, I believe the level of the community interest and support to Stop Bengeo Quarry remains as strong as it was before.<\/p>\n<p>Your signature &amp; contact details (they count letters so may be better to send individual responses rather than combined household responses)<\/p>\n<p>&nbsp;<\/p>\n<p>Please send to Ms Felicity Hart (ref: PL\\0870\\17) by 2 November either by email (<a href=\"mailto:spatialplanning@hertfordshire.gov.uk\">spatialplanning@hertfordshire.gov.uk<\/a>) or by post (Felicity Hart, Spatial Planning and Economy Unit, CHN216, County Hall, Hertford SG13 8DN).<\/p>\n<hr \/>\n<p><strong>Sample letter for The Appeal<\/strong><\/p>\n<p>Dear Ms Dutton,<\/p>\n<p>I am writing to you in regards to the appeal against the Hertfordshire County Council&#8217;s decision to refuse planning permission for the phase extraction of 1.75 mln tonnes of sand and gravel on land at Ware Park, Wadesmill Road, Herts (locally known as Bengeo Field) &#8211; appeal reference APP\/M1900\/W\/17\/3178839.<\/p>\n<p>I have objected to this application on the grounds of: [list key reasons of objections, they will have copies of ALL the original letters &amp; emails we submitted previously to HCC].<\/p>\n<p>Having followed the planning process very closely \/ Having been at the HCC Development Control Committee, I very much welcomed the decision made by the Planning Committee and the representation of local community made by Stop Bengeo Quarry speakers.<\/p>\n<p>I would like to confirm that I continue to strongly object the proposal. In fact my grounds for objections are even stronger than before as I have further concerns in relation to the pollution risk to water supply for Hertford area. I am also aware that the proposed area is not recommended to be considered as &#8220;preferred area&#8221; in the emerging Minerals Local Plan.<\/p>\n<p>I would like to have an opportunity to speak at the Public Inquiry and present my views.<\/p>\n<p>Sign and your contact details<\/p>\n<p>&nbsp;<\/p>\n<p>Please send 3 COPIES of the same letter by 7 November to Ms Holly Dutton (appeal ref APP\/M1900\/W\/17\/3178839), The Planning Inspectorate, Room 30, Temple Quay House, 2 The Square, Bristol BS1 6PN. Alternatively you can do it on-line <a href=\"https:\/\/acp.planninginspectorate.gov.uk\">https:\/\/acp.planninginspectorate.gov.uk<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bengeo residents are now faced with a double threat to their natural landscape and the possible contamination of Hertford&#8217;s water supply, as developers continue to pursue their proposal of a quarry at Bengeo Field (along the B158 and Sacombe Road). Despite the depth of opposition against the Bengeo quarry proposal, the applicants have submitted both <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=3194\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":3197,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-3194","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3194"}],"version-history":[{"count":6,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3194\/revisions"}],"predecessor-version":[{"id":3203,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3194\/revisions\/3203"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/3197"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}