{"id":3092,"date":"2017-07-04T20:24:30","date_gmt":"2017-07-04T19:24:30","guid":{"rendered":"http:\/\/www.molewood.org.uk\/?p=3092"},"modified":"2017-07-04T20:32:22","modified_gmt":"2017-07-04T19:32:22","slug":"train-service-to-stevenage-to-close-for-7-years","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=3092","title":{"rendered":"Train service to Stevenage to close for 7 years"},"content":{"rendered":"<div id=\"attachment_2843\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2843\" class=\"size-full wp-image-2843\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north.jpg\" alt=\"Hertford North station\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north.jpg 300w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north-150x150.jpg 150w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north-200x200.jpg 200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-2843\" class=\"wp-caption-text\">Hertford North station<\/p><\/div>\n<p>Govia Thames Link announced that they are planning to stop the rail route between Hertford and Stevenage via Watton-at-Stone. This will be the biggest timetable change on the routes affected in a generation which is why GTR are seeking feedback from those affected.<\/p>\n<p>Part of the changes include almost double capacity between Hertford North and London off-peak, as well as increased capacity north of London overall. This increase in trains will require a new platform to be built in Stevenage by Network Rail.<\/p>\n<p>Unfortunately, during these works GTR are planning on replacing trains with buses between Watton-at-Stone and Stevenage, as well as running buses between Hertford North and Stevenage.<\/p>\n<p>This is being done in order for more trains to run further north. GTR believe this will only affect 1,100 passengers per day, but that 104,000 passengers will benefit.<\/p>\n<p>Many residents are unhappy with the proposed bus replacement while the work takes place, and on the 3rd July, residents and councillors visited Hertford North to protest the changes. Their objection is that terminating the service at Hertford will pose a number of significant problems including:<\/p>\n<ul>\n<li>disrupting travel to and from Stevenage and Cambridge (restricting access to services such as local hospitals in Stevenage and Cambridge)<\/li>\n<li>disrupting children&#8217;s journeys to school<\/li>\n<li>increasing traffic and parking issues in Hertford (the bus replacement service is planned to be provided)<\/li>\n<li>making travel more problematic for people with mobility difficulties, parents with buggies and travellers with luggage wishing to go north.<\/li>\n<\/ul>\n<div id=\"attachment_3096\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/07\/govia_protesters.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3096\" class=\"size-full wp-image-3096\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2017\/07\/govia_protesters.jpg\" alt=\"Protests from residents and councillors\" width=\"300\" height=\"200\" \/><\/a><p id=\"caption-attachment-3096\" class=\"wp-caption-text\">Protests from residents and councillors<\/p><\/div>\n<p>Lower Bengeo Residents&#8217; Association (LoBRA) and HCC are requesting that Govia reconsiders its plans. The online consultation with the public is now open at <a href=\"https:\/\/www.transformingrail.com\" target=\"_blank\">https:\/\/www.transformingrail.com<\/a>.\u00a0 The consultation document itself can be downloaded by clicking on the &#8216;download pdf&#8217; box on the &#8216;Be part of it&#8217; page at <a href=\"https:\/\/www.transformingrail.com\/be-part-of-it\" target=\"_blank\">https:\/\/www.transformingrail.com\/be-part-of-it<\/a>.\u00a0 This is a different document to the various information sheets which follow it.\u00a0 The actual timetables proposed can be gained through inserting a journey in the relevant boxes on the main <a href=\"https:\/\/www.transformingrail.com\/\" target=\"_blank\">https:\/\/www.transformingrail.com\/<\/a> page and then downloading a pdf which appears as a result of the journey that is being input. The consultation closes at <strong>17:00 on Thursday 27 July<\/strong>.<\/p>\n<p>It should be noted that the timetable proposals detailed for the Hertford Loop on the Great Northern Metro include services that would only be available for most journeys between Watton-at-Stone and Stevenage following the completion of a fifth platform at Stevenage Station.\u00a0 In the interim, a replacement bus service would operate between Hertford North\/Watton-at-Stone and Stevenage.\u00a0 Details of what form the bus replacement service would take and proposed timetabling of such have yet to be released.\u00a0 Likewise, weekend timetables are yet to be published (but are expected later this year).<\/p>\n<p>Although not publicised on the website, it is understood from the consultation document itself that Govia will be holding a roadshow at Hertford North station on the evening of <strong>Wednesday 12 July between 17:00 and 19:00<\/strong>, which will provide the opportunity to ask questions of Govia staff about the proposals.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Govia Thames Link announced that they are planning to stop the rail route between Hertford and Stevenage via Watton-at-Stone. This will be the biggest timetable change on the routes affected in a generation which is why GTR are seeking feedback from those affected. Part of the changes include almost double capacity between Hertford North and <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=3092\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":2843,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-3092","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3092"}],"version-history":[{"count":5,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3092\/revisions"}],"predecessor-version":[{"id":3098,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3092\/revisions\/3098"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/2843"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}