{"id":3005,"date":"2017-05-13T18:10:02","date_gmt":"2017-05-13T17:10:02","guid":{"rendered":"http:\/\/www.molewood.org.uk\/?p=3005"},"modified":"2017-05-13T18:13:14","modified_gmt":"2017-05-13T17:13:14","slug":"tarmac-waterford-update-may-2017","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=3005","title":{"rendered":"Tarmac Waterford Update May 2017"},"content":{"rendered":"<p>Below is an update from Tarmac about their work at Waterford since December.<\/p>\n<p><strong>Project Team<\/strong><br \/>\nCRH Tarmac has appointed Ignacio Escobar \u2013 a highly qualified and experienced engineer \u2013 as the new in-house Waterford team leader. CRH Farrans Construction will now be the lead building contractor and Flanaghan and Lawrence are the architects. The project will be managed by Faithful and Gould \u2013 who will be the main contact\/liaison point with the local community and myself.<\/p>\n<p><strong>Timescales<\/strong><br \/>\nThese have not yet been finalised \u2013 but we anticipate being able to share them with you over the next few weeks. Our ultimate objective is to have discharged all the planning conditions by the end of this year and to have completed the development by the end of 2018.<\/p>\n<p><strong>Discharging conditions<\/strong><br \/>\nYou may recollect that the planning permission \u2013 granted by East Herts District Council in December 2015 \u2013 was issued subject to us discharging several conditions. Some of these have to be completed prior to commencement, some prior to building\/construction and some prior to occupation.<\/p>\n<table>\n<tbody>\n<tr>\n<th><\/th>\n<th>Prior to commencement<\/th>\n<th><\/th>\n<th>Prior to building\/construction<\/th>\n<th><\/th>\n<th>Prior to occupation<\/th>\n<\/tr>\n<tr>\n<td>1<\/td>\n<td><strong>Landscaping<\/strong><br \/>\nFull details of hard and soft landscaping<\/td>\n<td>1<\/td>\n<td><strong>Archaeology<\/strong><br \/>\n7 trial trenches. TBC following outcome of ongoing discussions with County Archaeologist<\/td>\n<td>1<\/td>\n<td><strong>Contaminated Lane<\/strong><br \/>\nCompletion and effectiveness report<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td><strong>Contaminated land<\/strong><br \/>\nIdentification and methodology for removal of any contaminated land<\/td>\n<td>2<\/td>\n<td><strong>External materials<\/strong><br \/>\nSamples to be supplied<\/td>\n<td>2<\/td>\n<td><strong>Sustainability<\/strong><br \/>\nSustainability certificate to be issued post construction<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td><strong>Ecology<\/strong><br \/>\nUpdated bat and reptile surveys<\/td>\n<td>3<\/td>\n<td><strong>Highways<\/strong><br \/>\nDetails of junction improvements for Sacombe Rd\/Vicarage Lane and maintenance access to Vicarage Lane<\/td>\n<td>3<\/td>\n<td><strong>Ecology<\/strong><br \/>\nBird box details<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td><strong>Footpath<\/strong><br \/>\nApproval of details<\/td>\n<td>4<\/td>\n<td><strong>Wheel washing<\/strong><br \/>\nFacilities to be operated throughout construction period<\/td>\n<td>4<\/td>\n<td><strong>Certificate of completion<\/strong><br \/>\nRef footway works<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td><strong>Footpath Route<\/strong><br \/>\nTo be walked and check for any significant habitats<\/td>\n<td>5<\/td>\n<td><strong>Construction vehicles<\/strong><br \/>\nDetails of movements and access arrangements<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td><\/td>\n<td>6<\/td>\n<td><strong>Hydrology<\/strong><br \/>\nDetailed surface water drainage scheme<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td><\/td>\n<td>7<\/td>\n<td><strong>Foul Drainage<\/strong><br \/>\nDetailed scheme<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td><\/td>\n<td>8<\/td>\n<td><strong>Sustainability<\/strong><br \/>\nConfirmation of Proposed Code Level 6 (or current equivalent standard)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Some of you may have noticed an unusual number of people on the site recently? You will see more of them over the next few weeks and months, as they carry out the site investigations which will allow us to discharge the conditions. Without completing the investigations and surveys identified in the attached table, we can\u2019t discharge the planning conditions and wouldn\u2019t be able to deliver the approved scheme.<\/p>\n<p><strong>Stakeholder Engagement<\/strong><br \/>\nAs you can probably tell just from these bare outlines, we have quite a lot of work to do in the very near future. This includes finalising our timelines, briefing the consultants \u2013 and then evaluating their reports. As ever, keeping in touch with you all remains one of our key objectives \u2013 which is why we thought we would give you the good news as soon as we could.<\/p>\n<p>However, we will have to ask you to be patient with us for just a little longer, while we dot the i\u2019s and cross the t\u2019s.<\/p>\n<p><strong>Footpath<\/strong><br \/>\nMany thanks to those of you who gave us your feedback on the new footpath. These have all been forwarded to County Highways \u2013 and we await their response.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Below is an update from Tarmac about their work at Waterford since December. Project Team CRH Tarmac has appointed Ignacio Escobar \u2013 a highly qualified and experienced engineer \u2013 as the new in-house Waterford team leader. CRH Farrans Construction will now be the lead building contractor and Flanaghan and Lawrence are the architects. The project <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=3005\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":2960,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-3005","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3005"}],"version-history":[{"count":5,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3005\/revisions"}],"predecessor-version":[{"id":3010,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3005\/revisions\/3010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/2960"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}