{"id":2841,"date":"2016-11-06T22:23:03","date_gmt":"2016-11-06T22:23:03","guid":{"rendered":"http:\/\/www.molewood.org.uk\/?p=2841"},"modified":"2016-11-06T22:23:50","modified_gmt":"2016-11-06T22:23:50","slug":"bus-replacement-between-hertford-and-stevenage-in-2018","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=2841","title":{"rendered":"Bus replacement between Hertford and Stevenage in 2018"},"content":{"rendered":"<div id=\"attachment_2843\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2843\" class=\"size-medium wp-image-2843\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north-300x300.jpg\" alt=\"Hertford North station\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north.jpg 300w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north-150x150.jpg 150w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2016\/11\/hertford_north-200x200.jpg 200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-2843\" class=\"wp-caption-text\">Hertford North station<\/p><\/div>\n<p>Govia Thameslink Railway (GTR) have issued a consultation document to discuss proposed changes to the 2018 timetable. As this will be the biggest timetable change on the routes affected in a generation\u00a0GTR are seeking feedback from those affected.<\/p>\n<p>Part of the changes include almost double capacity between Hertford North\u00a0and London off-peak, as well as increased capacity north of London overall. This increase in trains will require a new platform to be built in Stevenage by Network Rail.<\/p>\n<p>Unfortunately, during these works\u00a0GTR are planning on replacing trains with buses between Watton-at-Stone and Stevenage, as well as running buses between Hertford North and Stevenage. This is being done\u00a0in order for more trains to run further north.<\/p>\n<p>GTR believe this will only affect 1,100 passengers per day, but that 104,000 passengers will benefit. Because GTR do not know how long the works will take to complete there is no end date for the replacement bus service.<\/p>\n<p>If you would like to view or comment on these proposals you can do so by the 8th December\u00a0<a href=\"http:\/\/www.thameslinkrailway.com\/your-journey\/timetable-consultation\" target=\"_blank\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Govia Thameslink Railway (GTR) have issued a consultation document to discuss proposed changes to the 2018 timetable. As this will be the biggest timetable change on the routes affected in a generation\u00a0GTR are seeking feedback from those affected. Part of the changes include almost double capacity between Hertford North\u00a0and London off-peak, as well as increased <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=2841\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":1517,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-2841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2841"}],"version-history":[{"count":3,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2841\/revisions"}],"predecessor-version":[{"id":2845,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2841\/revisions\/2845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/1517"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}