{"id":2648,"date":"2016-04-27T21:42:24","date_gmt":"2016-04-27T20:42:24","guid":{"rendered":"http:\/\/www.molewood.org.uk\/?p=2648"},"modified":"2016-04-27T21:48:31","modified_gmt":"2016-04-27T20:48:31","slug":"lafarge-tarmac-housing-update","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=2648","title":{"rendered":"Lafarge Tarmac housing update"},"content":{"rendered":"<p>We have had some news from RR Environmental Communications, on behalf of Lafarge Tarmac, about their development for 8 homes\u00a0along Sacombe Road. Their communication has been copied below. If you&#8217;d like to view historic posts about this story, you can see them <a title=\"Lafarge Tarmac granted planning permission\" href=\"https:\/\/www.molewood.org.uk\/news\/lafarge-tarmac-granted-planning-permission\/\" target=\"_blank\">here<\/a> and <a title=\"Lafarge Tarmac submit planning application\" href=\"https:\/\/www.molewood.org.uk\/news\/lafarge-tarmac-submit-planning-application\/\" target=\"_blank\">here<\/a>.<\/p>\n<p><strong>Legal issues<\/strong><br \/>\nThe planning permission and the S106 agreement are both agreed.<\/p>\n<p>The S106 includes:<\/p>\n<ul>\n<li>a \u00a310,000 sustainable transport contribution \u2013index linked to contribute to a scheme to provide measures to influence the speed and volume of traffic along Sacombe Road and beyond \u2013 to include Bullsmill Lane<\/li>\n<li>the definition of the development includes the footpath provisions as set out in the planning application and approved by the planning permission<\/li>\n<li>the party to the deed owner (Tarmac) includes any successors in title to that party \u2013 and the obligations are enforceable against the successors in title<\/li>\n<li>Schedule 1 Footway Works \u2013 needs county council approval of detail before starting and payment of STC before commencement date.<\/li>\n<\/ul>\n<p><strong>Construction<\/strong><br \/>\nWe are still seeking an appropriate developer and supplier of precast concrete to deliver the proposed development \u2013 both of whom need to be able to demonstrate they will consistently work to the standards we require.\u00a0 Specifically, we have been talking to some Scandinavian suppliers who already manufacture a product that appears to be suitable for the project, who are keen to carry out a project in the UK. We are hoping to have a high level meeting with them at their factory during May.\u00a0 This would lead us towards a pre-cast construction solution that could be bought off the shelf.\u00a0 If we can sort this out, build time would be considerably reduced over conventional building methods.<\/p>\n<p><strong>Ecological survey<\/strong><br \/>\nWe have completed the Phase 1 Habitat Survey &#8211; designed to clarify the habitats, identify any protected species\/habitats and identify any necessary mitigation works.<\/p>\n<p>The bat roost surveys \u2013 on the only oak tree scheduled for removal \u2013 will be carried out between May and September.<\/p>\n<p>Ecological supervision will be carried out during the vegetation clearance and footpath construction, to make sure any reptiles present are not harmed.<\/p>\n<p><strong>New footpath<\/strong><br \/>\nWe are moving forward with our plans to implement the development by constructing the footpath before anything else. The costs for this are already allocated in this year\u2019s budget and we are moving as quickly as we can to get started on site.\u00a0 We would be keen to involve HMWT where and when we can.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have had some news from RR Environmental Communications, on behalf of Lafarge Tarmac, about their development for 8 homes\u00a0along Sacombe Road. Their communication has been copied below. If you&#8217;d like to view historic posts about this story, you can see them here and here. Legal issues The planning permission and the S106 agreement are <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=2648\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":1976,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-2648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2648"}],"version-history":[{"count":7,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2648\/revisions"}],"predecessor-version":[{"id":2655,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/2648\/revisions\/2655"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/1976"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}