{"id":1298,"date":"2015-01-21T11:51:37","date_gmt":"2015-01-21T11:51:37","guid":{"rendered":"http:\/\/www.ogieronline.com\/?p=1298"},"modified":"2015-02-27T11:52:30","modified_gmt":"2015-02-27T11:52:30","slug":"port-hill-traffic-lights-update","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=1298","title":{"rendered":"Port Hill Traffic Lights Update"},"content":{"rendered":"<div id=\"attachment_1601\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/port_hill_lights.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1601\" class=\"size-medium wp-image-1601\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/port_hill_lights-300x300.jpg\" alt=\"Port Hill Lights\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/port_hill_lights.jpg 300w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/port_hill_lights-150x150.jpg 150w, https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/port_hill_lights-200x200.jpg 200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1601\" class=\"wp-caption-text\">Port Hill Lights<\/p><\/div>\n<p>It looks as though work will begin on the Port Hill traffic lights this Summer. This work is part of a larger strategy to improve pedestrian access within Hertford, and further details can be found in the pdfs <a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/02\/port-hill-consultation.pdf\">here<\/a> and <a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/02\/port-hill-layout.pdf\">here<\/a>.<\/p>\n<p>There have been objections to the plan from some residents who live near to the proposed crossing, and County Councillor Andrew Stevenson has written a letter explaining the reasons why the location was chosen. You can read this letter below.<\/p>\n<p><i>The scheme for the installation of the Port Hill pedestrian crossing is part<br \/>\nof a larger strategy to improve pedestrian access within Hertford, and<br \/>\nincludes a pedestrian\/cycling route around the Sainsbury&#8217;s site linking to<br \/>\nthe town centre which has already been delivered (see attached plan for<br \/>\nreference). The scheme is being funded from S106 monies negotiated to<br \/>\nimprove pedestrian facilities in mitigation for the transport impact of the<br \/>\nSainsbury&#8217;s development. Traffic surveys undertaken pre and post<br \/>\nconstruction of the Sainsbury&#8217;s site show an increase in traffic volumes and<br \/>\nqueuing on the B158 (Port Hill). Prior to our involvement on this scheme,<br \/>\nand subsequent consultation, local residents had campaigned to the County<br \/>\nCouncil for the installation of a safe crossing at this location to provide<br \/>\nimproved access to local schools and nursery facilities.<\/i><\/p>\n<p>The crossing proposals have been the subject of a detailed feasibility study<br \/>\nwhich investigated a large number of alternative crossing locations along<br \/>\nPort Hill and Cowbridge (B158). This included the feasibility of installing<br \/>\na pedestrian route underneath the old Port Hill railway bridge and the<br \/>\ninstallation of a crossing point on the apex of the bridge. Each of the<br \/>\nalternative proposals was considered in detail and found to be unsuitable<br \/>\ndue to various technical difficulties associated with the need to install<br \/>\nfacilities which comply with Highways safety and design standards.<\/p>\n<p>We therefore concluded that the current proposed location for the &#8216;Puffin&#8217;<br \/>\ncrossing on Port Hill offers the best solution within the constraints<br \/>\nimposed by the highway alignment and surrounding buildings. The proposals<br \/>\nwere the subject of a consultation exercise conducted in August 2014 which<br \/>\nwas distributed to over 1,000 properties across the areas of west Hertford<br \/>\nand Bengeo which suffer a degree of severance from the town centre due to<br \/>\nthe volume of traffic using the B158. The design incorporates various<br \/>\nmeasures designed to address issues raised during the consultation exercise<br \/>\nregarding sight-lines and traffic speeds. The concerns of the adjacent<br \/>\nresidents in regard to possible light and noise pollution will be addressed<br \/>\nwithin the detailed design stage of the scheme. Methods which could be<br \/>\nemployed involve the use of shrouds on the traffic signals and the removal<br \/>\nor reduction of the audible signal as necessary.<\/p>\n<p>Concerns were also raised in regard to the reduction of available parking<br \/>\nspaces associated with the crossing installation and we feel that this is<br \/>\nthe key reason why residents in the immediate vicinity raise objections to<br \/>\nthe scheme. This has been estimated as equivalent to 7 car parking spaces.<br \/>\nAnecdotal evidence suggests that the area is regularly used by workers from<br \/>\nlocal businesses, which has an obvious impact on the level of parking<br \/>\navailable to the residents. Prior to the crossing proposals East Herts<br \/>\nDistrict Council conducted two consultations on proposals for a residents&#8217;<br \/>\nparking permit scheme on Port Hill. We understand that on both occasions the<br \/>\nscheme was rejected.<\/p>\n<p>While we recognise the effect of the proposals upon the availability of<br \/>\nparking in the immediate area, we consider that the proposed crossing<br \/>\ninstallation will provide greater value to a far larger section of the<br \/>\ncommunity in terms of the safety and accessibility benefits afforded. The<br \/>\nConsultation was distributed to over 1000 properties, and 136 responses were<br \/>\nrecorded with 110 in support and 19 against. A decision has therefore been<br \/>\nmade to proceed with the crossing and formal orders have now been published.<br \/>\nWe anticipate that the construction would be scheduled to take advantage of<br \/>\nthis year&#8217;s school summer holidays. We feel that the proposed solution<br \/>\nstrikes the right balance in achieving the County Council&#8217;s aims to improve<br \/>\nsustainable travel whilst taking on-board a wide array of views, both<br \/>\nin-house technical views and those of the residents which includes likely<br \/>\nusers of the facility from a wider area as well as residents in the<br \/>\nimmediate vicinity.<\/p>\n<p>Some preliminary engineering work is being done to ascertain where<br \/>\nunderground essential services lie that might interfere with the work.<br \/>\nThe main civil engineering work is planned for the school holidays.<\/p>\n<p>On balance I feel that investment in improved walking routes that improve<br \/>\nsafety in crossing the B158 and help slow down traffic is a positive step<br \/>\nfor the majority of Bengeo residents although I accept the location may not<br \/>\nbe welcome by those who live immediately adjacent to the crossing. However<br \/>\nthe current situation is increasingly dangerous for people trying to cross<br \/>\ninto Hartham from the half of the other side of the B158 \u00adespecially for<br \/>\nmothers with small children, elderly people \u00ador indeed anyone as the<br \/>\ntraffic speeds there seem to increase year by year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work on the Port Hill traffic lights is due to being this Summer. More details on the proposal can be found in this story. <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=1298\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":1600,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-1298","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1298"}],"version-history":[{"count":3,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1298\/revisions"}],"predecessor-version":[{"id":1605,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1298\/revisions\/1605"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/1600"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}