{"id":1114,"date":"2012-10-30T21:09:46","date_gmt":"2012-10-30T21:09:46","guid":{"rendered":"http:\/\/www.ogieronline.com\/?p=1114"},"modified":"2015-03-02T11:28:42","modified_gmt":"2015-03-02T11:28:42","slug":"playground-improvements","status":"publish","type":"post","link":"https:\/\/www.molewood.org.uk\/?p=1114","title":{"rendered":"Playground improvements"},"content":{"rendered":"<div>\n<div><a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/playground1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-1594\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/01\/playground1.jpg\" alt=\"Sacombe Rd Field\" width=\"300\" height=\"200\" \/><\/a>Fairview, the builders of the Serenity estate on Sacombe Road, have completed improvements to the neighbouring playground.The new equipment includes:<\/p>\n<ul>\n<li>Tyre swing<\/li>\n<li>Mini suspension bridge<\/li>\n<li>Wooden climbing structure<\/li>\n<li>Seesaw<\/li>\n<\/ul>\n<div>\n<div>\n<p>\u00a0<a href=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/03\/playground2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-2121 alignleft\" src=\"https:\/\/www.molewood.org.uk\/wp-content\/uploads\/2015\/03\/playground2.jpg\" alt=\"playground2\" width=\"300\" height=\"200\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><strong>Original Post<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div>\n<div class=\"updatedsmall\"><\/div>\n<p>Fairview, the builders of the Serenity estate on Sacombe Road, are due to start work on improvements to the playground behind The Wick on Monday 14 May.<\/p>\n<p>They have alerted nearby residents by dropping a letter into each house. It tells them that work is due to start in week commencing 14th May and that the order of work will be as follows:-<\/p>\n<ul>\n<li>Fence off an area incorporating the basketball area. This will allow Fairview to import the soil required to construct the raised earth mounds. They will endeavour to keep the play area open as long as possible.<\/li>\n<li>Turf the new earth mounds and plant native woodland tree species. Allowing the turfed area time to establish itself before being handed over for use<\/li>\n<li>Fence off the whole play area to allow installation of new play equipment.<\/li>\n<li>Once completed remove all fencing ready for use.<\/li>\n<\/ul>\n<p>Fairview will try to maintain access around their work at all times to ensure that the rest of the playing field can still be used. Should you have any concerns or require any further information, please contact John Gorrell (site manager) on 07765 896762.<\/p>\n<p>We first told you about their plans in a news item here on 7 March. You can still find the story by following this <a title=\"Playground improvements coming\" href=\"https:\/\/www.molewood.org.uk\/news\/playground-improvements-coming\/\" target=\"_blank\">link<\/a>, along with a plan of the work and details of the play equipment they will be installing.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The playground improvements made by Fairview as part of the Serenity development have been completed and open for children to use. <span class=\"ellipsis\">&hellip;<\/span> <span class=\"more-link-wrap\"><a href=\"https:\/\/www.molewood.org.uk\/?p=1114\" class=\"more-link\"><span>Read More &rarr;<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":2120,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-1114","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1114"}],"version-history":[{"count":16,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1114\/revisions"}],"predecessor-version":[{"id":2137,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1114\/revisions\/2137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=\/wp\/v2\/media\/2120"}],"wp:attachment":[{"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.molewood.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}